Address: Ocean Drive, Bonny Hills
Client: Private
Value: 2.0 M
Start Date: June 2016
Finish Date: May 2017
Key Components: Sub-divison Construction, Road Construction, Pipeline Construction, Gravity Sewer Construction, Drainage, Bulk Earthworks
The population of Lochinvar is expected to grow over 25 times in the next 30 years and the region will see a number of new major developments.
With more people and businesses moving to the region essential water and sewer services must be upgraded.
Eire completed the Lochinvar Water Pump Station in September 2016 and have now secured the contract to upgrade the Lochinvar Wastewater Pump Station and associated sewerage network pipelines. The $5.2 million dollar, 48 week contract is scheduled to be completed in late 2017.
The project includes:
• construction of a 6.5 metre diameter cast in-situ pump well
• 120 kl pre-cast emergency storage structure
• 2.2 kilometres of 375 diameter rising main
• 2.9 kilometres of varying sizes of gravity sewer which includes trenchless crossings