Client:Hunter Water Corporation
Location
: Lower Hunter Region, NSW
Period: 2022-2024
Status: Completed
Project Value: $6.1M

Key Works: Wastewater leak detection system upgrades

EIRE was chosen by Hunter Water to deliver critical upgrades across multiple water and wastewater treatment sites. This project involves the design and construction of processing, civil, structural, mechanical and electrical elements of the wastewater treatment process.

These upgrades will ensure the safety of Hunter Water staff and their subcontractors. It will also eliminate and reduce the risk of chemical spills within the wastewater treatment works, providing safer and greener operational performance.

This project will work in conjunction with Hunter Water’s Leak Detection Pit system – ensuring that all the redesigns improve the performance and reliability of the existing systems.

All physical upgrades will occur during low operational peaks, ensuring there is zero impact on local residents. Any works completed will maintain the operations and compliance required for water quality and effluent treatment during construction works.

The Hazchem 3 package is a multi-site project, where works will be completed simultaneously. Management of these sites and all its moving pieces display EIRE’s thorough project management skills.

Leak detection system upgrades:

  • Karuah WWTW
    • Ferrous chloride
  • Branxton WWTW
    • Aluminium sulphate
    • Sodium hydroxide
    • Sodium bisulphite
    • Citric acid
    • Sodium hypochlorite
  • Paxton WWTW
    • Aluminium sulphate
    • Sodium hydroxide
    • Citric acid
    • Sodium hypochlorite
  • Nelson Bay WTP
    • Chlorine (gas)
    • Chioptus
  • Chester Dam
    • Chlorine (gas)

More Hive 5 Live

Fixing Country Bridges

Client: Port Macquarie Hastings CouncilLocation: Donkins Flat, Crowe Roads, Tower Rd, Farrawells Road, Throne River Road, Old School Road Cutty Creek & Joes BridgePeriod: 2023 –

HAZCHEM Package 3

Client:Hunter Water CorporationLocation: Lower Hunter Region, NSWPeriod: 2022-2024Status: CompletedProject Value: $6.1M Key Works: Wastewater leak detection system upgrades EIRE was chosen by Hunter Water to deliver critical

Gordon St Rehabilitation

Client: Port Macquarie Hastings CouncilLocation: Port Macquarie, NSWPeriod: 2021 – 2022Status: CompletedProject Value: $7.7M EIRE Constructions was awarded the Gordon Street project to improve the existing

Grahamstown Treatment Plant

Client: Hunter Water CorporationLocation: Tomago, NSWPeriod: 2024Status: CurrentProject Value: $38M Eire were awarded the Hunter Water Corporation Grahamstown Treatment Plan project aimed at enhancing the chemical

Black Hill Trunk Main Duplication

Client: Hunter Water CorporationLocation: Blackhill, NSWPeriod: 2023 – 2024Status: CompletedProject Value: $3.9M Key Works: Design of pipeline | Community Liaison and Communication Plan | Supply and