Black Hill Trunk Main Duplication

Client: Hunter Water Corporation
Location
: Blackhill, NSW
Period: 2023 – 2024
Status: Completed
Project Value: $3.9M

Key Works: Design of pipeline | Community Liaison and Communication Plan | Supply and install 2.6km of DN375 PVC | HDD boring of 350m of trenchless pipeline | Supply, fabrication and installation of HDPE pipeline | Commissioning

Eire Constructions were engaged to design, supply, install, construct, test, commission and document the Black Hill Duplicate Trunk Main for Hunter Water.

The new 3km duplicate trunk main connects the existing rising main from John Renshaw Drive to Black Hill, alongside an existing 200mm pipeline. Open trench excavation method was used for the majority of the 3km, with the exception of four sections that were underbored. The pipeline was connected back into the existing Hunter Water mainline at two points.

Eire worked seamlessly with Hunter Water on this site which was registered with the Aboriginal Heritage Information Management System database. Works were conducted adjacent to major gas pipeline construction works, being undertaken concurrently with a Site Cooperative use plan being implemented and executed without incident.

Night works were engaged to complete connections to the existing active mainline to reduce impact to Hunter Water customers which was undertaken successfully.

Site restoration works included 40,000m2 of topsoil reinstatement and Hydromulch activities effectively returning the site to its pre-existing condition upon completion of trunk main installation works.

More Hive 5 Live

Fixing Country Bridges

Client: Port Macquarie Hastings CouncilLocation: Donkins Flat, Crowe Roads, Tower Rd, Farrawells Road, Throne River Road, Old School Road Cutty Creek & Joes BridgePeriod: 2023 –

HAZCHEM Package 3

Client:Hunter Water CorporationLocation: Lower Hunter Region, NSWPeriod: 2022-2024Status: CompletedProject Value: $6.1M Key Works: Wastewater leak detection system upgrades EIRE was chosen by Hunter Water to deliver critical

Gordon St Rehabilitation

Client: Port Macquarie Hastings CouncilLocation: Port Macquarie, NSWPeriod: 2021 – 2022Status: CompletedProject Value: $7.7M EIRE Constructions was awarded the Gordon Street project to improve the existing

Grahamstown Treatment Plant

Client: Hunter Water CorporationLocation: Tomago, NSWPeriod: 2024Status: CurrentProject Value: $38M Eire were awarded the Hunter Water Corporation Grahamstown Treatment Plan project aimed at enhancing the chemical

Black Hill Trunk Main Duplication

Client: Hunter Water CorporationLocation: Blackhill, NSWPeriod: 2023 – 2024Status: CompletedProject Value: $3.9M Key Works: Design of pipeline | Community Liaison and Communication Plan | Supply and